1City or county?
The City of Dawsonville is a small part of Dawson County, and many addresses outside it still read Dawsonville, GA 30534. Before planning tree work tied to construction, confirm which government has jurisdiction. Inside city limits, permits run through the City of Dawsonville Planning and Zoning office at 415 Highway 53 East, phone 706.203.4923, email [email protected], as listed on the city's residential permit application. Outside, they run through Dawson County Community Development.
The city's Plans and Permitting Forms page collects the applications, and it links the City of Dawsonville Code of Ordinances, published through Municode, for the zoning and development rules.
2What we could and could not verify
The city's zoning ordinance is the place to look for any tree protection or replacement rules that apply during development inside the city. We could not retrieve the current text of the city's tree provisions from the official code library when this page was written, so we do not summarize them here. If your tree work is part of a rezoning, subdivision, site plan or building permit inside city limits, ask Planning and Zoning which tree provisions apply and whether a tree survey or replacement plan is required before any trees come down.
For a homeowner removing a tree that is not part of a development or permit, the city's published forms do not list a tree removal permit or fee. That is not the same as saying none exists for every case; ask the office if you are unsure, and keep a note of the answer.
WORK COMMENCING BEFORE PERMIT ISSUANCE WILL RESULT IN DOUBLE PERMIT FEES
City of Dawsonville: Residential Building / Other Permit Application (PDF)
3Right-of-way work needs an encroachment permit
Trees along city streets often stand partly in the public right-of-way. The city's encroachment application, revised October 22, 2025, covers utility facility encroachments and any other encroachment onto city rights-of-way or city roads. It sets fees by scope, requires the applicant to contact the city at (706)265-3256 forty-eight hours before beginning the authorized work, and requires work to begin within six months of approval.
The form also includes an indemnification clause that refers specifically to cutting or removing trees on the right-of-way: the applicant agrees to hold the city harmless for damage or injury caused by that work. A tree service working on a city right-of-way should be the one applying and carrying the insurance for that risk; ask to see the approved permit.
| Item | Fee | Source |
|---|---|---|
| Demolition Permit (each structure), residential/other application | $50.00 | City residential permit application |
| Work commencing before permit issuance | Double permit fees | City residential permit application |
| Encroachment permit, adjoining a single parcel/tract | $50.00 | City encroachment application, rev. 10.22.2025 |
| Encroachment permit, adjoining two or more parcels/tracts | $100.00 | City encroachment application, rev. 10.22.2025 |
| Encroachment permit, city-wide | $500.00 | City encroachment application, rev. 10.22.2025 |
4Before you call the county or city
Have the property address, the parcel number from your tax bill and the owner's name ready, along with a rough sketch of which trees are coming down, where any creek or pond is, and how much ground the work will disturb. Photos help. Ask whether the job needs a Land Disturbance Permit, whether an erosion and sediment control plan is required, and whether any buffer applies. Write down the name of the person you spoke with, the date and what they told you, especially any fee amounts or documents they say you need. Fee schedules and forms change, and a short note of the call can save a second trip. If a contractor is handling the permit, ask for a copy of the application and the permit number once it is issued, and keep the approval with your property records. Ask, too, whether the office prefers its online portal, email or in-person applications, because the county and the city handle this differently.
5A short checklist
Confirm whether the property is inside the City of Dawsonville or in unincorporated Dawson County. Note how much ground the work will disturb and how close it comes to any creek, stream, pond or the lake. Check the subdivision's first plat date if the lot is in one. Look for power lines above the trees and call the utility on your bill if any tree is near them. Call Georgia 811 before any stump grinding or digging. Decide whether wood and brush will be chipped, hauled or burned, and check the burn permit rules if burning. Get written quotes that list the trees, the stumps, the debris and any permits. Ask for proof of insurance. Photograph the site before and after the work, and keep every permit, receipt and approval together.
6Comparing quotes
Ask each provider to put in writing what they will do: which trees come down, how they will be felled or lowered, whether stumps are ground and how deep, and whether wood, brush and chips are hauled away, chipped on site or left for you. A quote that leaves out stump grinding or debris removal is not comparable with one that includes them. Ask how long the job will take, what equipment will cross the lawn or driveway, and how damage to turf, fences or pavement will be handled. Ask whether any permit, encroachment approval or utility coordination is included, or whether that falls to you. Ask for proof of insurance and keep a copy. When the quotes are side by side, compare the scope first and the price second.
7Demolition and double fees
If a tree job includes taking down a shed, carport or other structure inside the city, the city's residential application lists a demolition permit for each structure. The same form warns, in capital letters, that work started before a permit is issued results in double permit fees. The county's schedule has the same double-fee penalty for unincorporated Dawson County.
Next: the county permit check for land disturbance thresholds, which matter in the city as well when state waters or larger areas are involved, and utility trimming for trees near power lines along streets.
Sources: City of Dawsonville: Plans and Permitting Forms; City of Dawsonville: Residential Building / Other Permit Application (PDF); City of Dawsonville: Encroachment Application / Permit, revised 10.22.2025 (PDF); City of Dawsonville Code of Ordinances (official codification, linked from the city permits page); Dawson County Land Disturbance Requirements 2026 (PDF). Checked 2026-10-26.
Quick answers
Who handles permits inside Dawsonville city limits?
The City of Dawsonville Planning and Zoning office, 415 Highway 53 East, 706.203.4923, per the city's residential permit application.
Do I need a permit to cut a tree on the city right-of-way?
Work on city rights-of-way requires an encroachment permit; the city's form sets fees of $50.00, $100.00 or $500.00 by scope and requires 48 hours' notice before work begins.
Does the city have tree protection rules?
Tree provisions for development are in the city's zoning code. Ask Planning and Zoning which apply before clearing for any development or permit.